unityzgy/Assets/StreamingAssets/XML/装备维修/维修案例1_en.xml

1 line
6.7 KiB
XML
Raw Blame History

This file contains ambiguous Unicode characters

This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.

<?xml version="1.0" encoding="utf-8"?><ArrayOfFixLink xmlns:xsd="http://www.w3.org/2001/XMLSchema" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance"><FixLink><fixLinkEnum>拆卸</fixLinkEnum><steps><StepData><id>1</id><describe>Use wheel chocks to secure two wheels on each side to prevent vehicle movement;</describe></StepData><StepData><id>2</id><describe>Unscrew the center bolts of the parking brake cylinders on the 2nd, 3rd, and 4th axles to fully release the parking brake;</describe><preIDs><int>1</int></preIDs></StepData><StepData><id>3</id><describe>Jack up any one lower suspension of the 2nd or 3rd axle to lift the wheels off the ground, preparing for removal of the drive shaft between the transmission and transfer case;</describe><preIDs><int>2</int></preIDs></StepData><StepData><id>4</id><describe>Open the latches and swing the front intake and exhaust louvers of the power compartment to the right;</describe><preIDs><int>3</int></preIDs></StepData><StepData><id>5</id><describe>Open the latches and lower the rear cover plate;</describe></StepData><StepData><id>6</id><describe>Unscrew the four horizontal fixing bolts on both sides of the crossbeam, and remove the crossbeam from the middle of the power compartment upward;</describe></StepData><StepData><id>7</id><describe>Remove the power compartment bulkheads from all directions;</describe></StepData><StepData><id>8</id><describe>At the rear right of the power compartment, 417mm from the bottom plate, disconnect the engine fuel supply pipe quick coupling (the integrated power unit side has a longer connecting hose);</describe></StepData><StepData><id>9</id><describe>At the top of the rear right of the power compartment, disconnect the engine fuel return pipe quick coupling;</describe></StepData><StepData><id>10</id><describe>On the sidewall of the front bulkhead of the power compartment, disconnect the quick coupling of the oil pipe connecting the clutch slave cylinder and the clutch master cylinder;</describe></StepData></steps><questions /></FixLink><FixLink><fixLinkEnum>安装</fixLinkEnum><steps><StepData><id>1</id><describe>Straighten and secure the shift control cable, and insert the shift control housing into the top of the transmission;</describe></StepData><StepData><id>2</id><describe>Tie the suction pipe of the fan cooling variable displacement pump on the vehicle side with thin wire for easy pulling through;</describe><preIDs><int>1</int></preIDs></StepData><StepData><id>3</id><describe>Use a special lifting tool to hoist the integrated power unit, check the balance of the lifting sling and the torsion/deflection of the integrated power unit, and adjust if necessary;</describe><preIDs><int>1</int><int>2</int></preIDs></StepData><StepData><id>4</id><describe>Lower the integrated power unit into the power compartment. During the descent, at an appropriate position, pass the suction pipe of the fan cooling variable displacement pump under the air compressor outlet pipe to reach the transmission top surface;</describe><preIDs><int>3</int></preIDs></StepData><StepData><id>5</id><describe>At 10mm before the integrated power unit seats, insert the right front fixing bolt and hand-tighten it, while connecting the main variable pump inlet pipe coupling. Then seat the integrated power unit;</describe></StepData><StepData><id>6</id><describe>Connect wiring harnesses: power compartment front acquisition controller signal cable plug; engine right middle top electronic control device actuator cable plug; transmission temperature sensor plug;</describe><preIDs><int>4</int></preIDs></StepData><StepData><id>7</id><describe>Connect oil pipes: fan variable pump suction pipe quick coupling; fan variable pump high-pressure pipe quick coupling; fan variable pump thermostatic valve drain pipe screw sleeve; fan variable pump return pipe quick coupling; fan motor outlet pipe and filter screw sleeve; steering pump suction pipe quick coupling; steering pump high-pressure pipe quick coupling; clutch master and slave cylinder connecting pipe quick coupling; transfer case return pipe quick coupling; diesel return pipe quick coupling;</describe></StepData><StepData><id>8</id><describe>Connect air pipes: clutch and shift slave cylinder supply pipe connecting screw sleeve; engine fuel shutoff cylinder air pipe connecting screw sleeve; integrated power unit middle engine exhaust pipe and muffler connecting clamp; power compartment front right corner air compressor and dryer connecting screw sleeve;</describe></StepData><StepData><id>9</id><describe>Connect water pipes: heater inlet water pipe quick coupling;</describe></StepData><StepData><id>10</id><describe>Mechanical connection: integrated power unit bolt on the right front inside of the vehicle body;</describe></StepData></steps><questions><Question><question>问题1:具体实施安装按照工位可划分几个工位点?</question><options><Item><Key><string>A</string></Key><Value><string>2个</string></Value></Item><Item><Key><string>B</string></Key><Value><string>3个</string></Value></Item><Item><Key><string>C</string></Key><Value><string>4个</string></Value></Item><Item><Key><string>D</string></Key><Value><string>5个</string></Value></Item></options><rightOptionsKey>C</rightOptionsKey></Question><Question><question>问题2:油路、水路、电气和机械连接时,快速接头、连接螺套、电气信号与控制插头、变速操纵器盒、传动轴及一体化动力装置底座等螺栓连接分别有几处?</question><options><Item><Key><string>A</string></Key><Value><string>快速接头13处、螺套5处、信号与控制插头8处、螺栓连接12处</string></Value></Item><Item><Key><string>B</string></Key><Value><string>快速接头10处、螺套6处、信号与控制插头11处、螺栓连接11处</string></Value></Item><Item><Key><string>C</string></Key><Value><string>快速接头12处、螺套5处、信号与控制插头6处、螺栓连接15处</string></Value></Item><Item><Key><string>D</string></Key><Value><string>快速接头11处、螺套7处、信号与控制插头10处、螺栓连接10处</string></Value></Item></options><rightOptionsKey>A</rightOptionsKey></Question><Question><question>问题3:安装时技术条件有哪些?</question><options><Item><Key><string>A</string></Key><Value><string>活动件与管路的间隙大于3mm活动件和活动件的间隙大于5mm</string></Value></Item><Item><Key><string>B</string></Key><Value><string>活动件与管路的间隙大于3mm活动件和活动件的间隙大于4mm</string></Value></Item><Item><Key><string>C</string></Key><Value><string>活动件与管路的间隙大于2mm活动件和活动件的间隙大于5mm</string></Value></Item></options><rightOptionsKey>B</rightOptionsKey></Question></questions></FixLink></ArrayOfFixLink>